Thursday, July 8, 2010

Fractured Glass 3: Painted outlines bring the triangles to life


Painting the outlines of each shape -- Step 4 for every nanoscape, is my last chance to make the shapes  as perfect as possible by making their corners meet and connecting them into their swoops and swirls.  I expect that it will take six days to finish outlining the 726 square inches of Fractured Glass 3. 
 
Here is a closeup that lets you see the difference between lined and unlined triangles.

1 comment:

  1. I recently came across your blog and have been reading along. I thought I would leave my first comment. I don’t know what to say except that I have enjoyed reading. Nice blog, I will keep visiting this blog very know that everybody must say the same thing, but I just think that you put it in a way that everyone can understand.
    Friv
    kogama

    ReplyDelete